Skip to content

Interchange Information

ID Number: RRC-INT-006

(INT) Interchange Scheduling and Coordination

Scheduled interchange must be coordinated between Balancing Authorities to prevent frequency deviations and accumulations of inadvertent interchange and prevent exceeding mutually established transfer limits. This standard was not modified from the original NERC standard in effect at the time. It is required so long as there is more than one LBA in the Interconnected system.

Noticed
Status: RCA Review
  1. The Technical Advisory Council (TAC) Reliability Standards Recommendation Submittal Package developed by the TAC Working Group led by the Chief Technical Officer (CTO). This package was noticed on November 11, 2024, and was acted upon by the Board on December 2, 2024.

    • Standards Development