This standard establishes Transmission system planning performance requirements within the planning horizon to develop a System that will operate reliably over a broad spectrum of conditions and following a wide range of probable Contingencies applicable to the portions of the Bulk Electrical System (BES) used to supply power to or from major load and generation centers.
5 days until working group meeting.
RRC-TPL-001 dissents and RRC responses.
The Technical Advisory Council (TAC) Reliability Standards Recommendation Submittal Package developed by the TAC Working Group led by the Chief Technical Officer (CTO). This package was noticed on January 21, 2025, and was acted upon by the Board on February 3, 2025.
Meeting materials for the RRC-TPL-001 Standards Working Group.
The schedule of development for RRC-TPL-001.
Alaska Railbelt 2018 Consensus Standard: Transmission Planning Performance Requirements.